Pakistan to Begin Solar Energy Panels Production within 1.5 Years – Research Snipers

Pakistan to Begin Solar Energy Panels Production within 1.5 Years

panel

It has been revealed by the Federal Minister for Science and Technology, Chaudhry Fawad Hussain that Pakistan will initiate the original production of solar energy panels within 1.5 years.

The minister said, “We will be able to transform free solar power to the batteries. With the rapid technological change, each residential unit will have its separate domestic powerhouse, and the size of the battery will reduce with its enhanced power.”

For the electric vehicles, 1 time chargeable 1 million-mile batteries are also being launched. They would replace the petrol vehicles in Pakistan in the years to come.

Must read: Govt. to Employ Overseas Pakistanis Who Lost Their Jobs

For electric vehicles, one time chargeable is being launched as well. They would replace petrol vehicles in Pakistan.

The Ministry of Science and Technology has been directed by Prime Minister Imran Khan to develop 400 science and technology schools all across Pakistan. 40 of these schools will be built in the major cities of the country.

Furthermore, the PTI lawmaker revealed that the 66% annual health budget of Pakistan is used to treat water-borne diseases. Thus, the Pakistan Council of Research in Water Resources (PCRWR) will share its data with the public to permit the construction of new water filtration plants via a data-driven approach.

via ProPakistani

Leave a Reply

Your email address will not be published. Required fields are marked *